Roof Restoration of a Manufacturing Facility
Highlights of this Large Scale Roof Repair Project
Capabilities Applied/Processes | Primary: Inspection Site Survey Design/Build Roof Restoration |
Secondary: Surface Preparation High Pressure Washing Warranty
|
Size of Roof | 200,000+ Square Feet | |
Products Worked With | Acrylic/Elastomeric Coating Urethane Coating |
Reinforced Fabric Mat |
Product Features | Fluid Applied Fully Reinforced Fully Seamless |
Fully Adhered Waterproof Membrane |
Industry for Use | Manufacturing Industrial |
|
Turnaround Time | Emergency Repair 2 Weeks | |
Delivery Location | Harrisburg, Pennsylvania | |
Standards Met | Customer Specifications | |
Project Name | Emergency Leak Repair to Roof/Roof Restoration |